Difference between revisions of "The big ass list"
Jump to navigation
Jump to search
Line 18: | Line 18: | ||
* outlet covers |
* outlet covers |
||
* blanks over speaker wiring |
* blanks over speaker wiring |
||
+ | * drywall repair on outside corner of closet |
||
+ | |||
=== dining room === |
=== dining room === |
||
* window shades |
* window shades |
Revision as of 21:40, 25 May 2019
The big ass list of things that need to be done to the house:
Indoors
entry way
- remove paint on tile
downstairs bath
- trim
TV room
- relocate outside light switch to sunroom
- outlet covers
- finish paint
sunroom
- drywall repairs
- paint (maybe)
- window trim
- re-do shades
front room
- outlet covers
- blanks over speaker wiring
- drywall repair on outside corner of closet
dining room
- window shades
kitchen
- countertops
- cabinet faces
- sink
- stove and exhaust
- drawer hardware and stuff
- dishwasher
- garbage disposal
- shelving on stuff-room wall
- door for attic storage space
stairwell and hallway
- drywall repairs
- diffuser
hall closet
- drywall
- texture
- paint
stuff room
Nya bedroom
- repair door frame
- door
- closet doors (maybe)
Ryker bedroom
- drywall repair
- paint
- door
- ceiling fan globe
upstairs bath
- replace subfloor
- flooring
- tub wallboard
- shower enclosure
- tub
- replace drywall (maybe)
- texture walls
- toilet
- vanity
- prime and paint
master bedroom
master bath
- re-caulk tub
- light fixture
- floor (hopefully not)
master closet
- matching shelf on dad's side
basement stairs
laundry room
- modern outlet for dryer
computer room
- shelving in northwest corner (maybe)
library
office
- finish paint
Outdoors
front side
- remove chalk artwork by garage
- remove yellow paint by front door
west side
- remove trash under evergreen tree
back side
- Finish up grape arbor
east side
shed
- repair sliding door (maybe)