The big ass list

From FnordWiki
Revision as of 17:25, 25 May 2019 by Adj (talk | contribs) (→‎kitchen)
Jump to navigation Jump to search

The big ass list of things that need to be done to the house:

Indoors

entry way

  • remove paint on tile

downstairs bath

  • trim

TV room

  • relocate outside light switch to sunroom
  • outlet covers
  • finish paint

sunroom

  • drywall repairs
  • paint (maybe)
  • window trim
  • re-do shades

front room

  • outlet covers
  • blanks over speaker wiring

dining room

  • window shades

kitchen

  • countertops
  • cabinet faces
  • sink
  • stove and exhaust
  • drawer hardware and stuff
  • dishwasher
  • garbage disposal

stairwell and hallway

  • drywall repairs
  • diffuser

hall closet

  • drywall
  • texture
  • paint

stuff room

Nya bedroom

  • repair door frame
  • door
  • closet doors (maybe)

Ryker bedroom

  • drywall repair
  • paint
  • door
  • ceiling fan globe

upstairs bath

  • replace subfloor
  • flooring
  • tub wallboard
  • shower enclosure
  • tub
  • replace drywall (maybe)
  • texture walls
  • toilet
  • vanity
  • prime and paint

master bedroom

master bath

  • re-caulk tub
  • light fixture
  • floor (hopefully not)

master closet

  • matching shelf on dad's side

basement stairs

laundry room

  • modern outlet for dryer

computer room

  • shelving in northwest corner (maybe)

library

office

  • finish paint

Outdoors

front side

  • remove chalk artwork by garage
  • remove yellow paint by front door

west side

  • remove trash under evergreen tree

back side

  • Finish up grape arbor

east side

shed

  • repair sliding door (maybe)